---
title: "Case Study: Design-Build vs. Design-Bid-Build for a New Dental Clinic"
description: Discover how the Design-Build approach transformed the remodel of Propper Smiles Orthodontics, delivering speed, flexibility, and improved collaboration.
image: https://www.therushcompanies.com/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/16-web-or-mls-J2G01105.jpg
---

[![Rush Logo](https://www.therushcompanies.com/hubfs/Rush%20Logo-2.svg) ](https://www.therushcompanies.com/)

[ Space for Lease ](https://www.therushcompanies.com/listings)

[ Tenant Portal ](https://www.securecafe3.com/newtenantportal/content2/login/?CompanyId=3092)

[ Investor Portal ](https://app.junipersquare.com/login?path=%2Fi%2Ftherushcompanies)

[Rush Commercial](https://www.therushcompanies.com/blog/tag/rush-commercial), [Case Studies](https://www.therushcompanies.com/blog/tag/case-studies)

# Case Study: Design-Build vs. Design-Bid-Build for a New Dental Clinic

 April 07, 2026

### Browse by division

- [View All](https://www.therushcompanies.com/blog/)
- [The Rush Companies](https://www.therushcompanies.com/blog/tag/the-rush-companies)
- [Rush Development](https://www.therushcompanies.com/blog/tag/rush-development)
- [Rush Capital](https://www.therushcompanies.com/blog/tag/rush-capital)
- [Rush Commercial](https://www.therushcompanies.com/blog/tag/rush-commercial)
- [Rush Properties](https://www.therushcompanies.com/blog/tag/rush-properties)
- [Rush Residential](https://www.rushresidential.com/blog)
- [Philanthropy](https://www.therushcompanies.com/blog/tag/philanthropy)
- [Case Studies](https://www.therushcompanies.com/blog/tag/case-studies)

All The Rush Companies Rush Development Rush Capital Rush Commercial Rush Properties Rush Residential Philanthropy Case Studies

Industry: Healthcare

Challenge: Choosing the ideal project delivery method for this clinic remodel: Design-Bid-Build (DBB) versus Design-Build (DB).

Results: The Design-Build approach enabled an accelerated timeline by removing gaps between phases and keeping decision-making centralized within one team.

---

![Dr. Propp Quote Image](https://www.therushcompanies.com/hs-fs/hubfs/Dr.%20Propp%20Quote%20Image.png?width=1022&height=587&name=Dr.%20Propp%20Quote%20Image.png)

### Project Details

Rush Commercial completed this 1,635 SF tenant improvement for Propper Smiles Orthodontics in Gig Harbor, WA. The project gave Dr. Nicholas Propp a new clinic where he could serve patients and staff with a custom reception desk, expansive staff lounge, added infrastructure to accommodate three orthodontic chairs, and new flooring and paint throughout. 

### ![16-web-or-mls-J2G01105](https://www.therushcompanies.com/hs-fs/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/16-web-or-mls-J2G01105.jpg?width=2048&height=1368&name=16-web-or-mls-J2G01105.jpg)The Challenge

Like many healthcare providers, Dr. Propp’s goal was to open his new clinic quickly without compromising on quality. Speed, coordination, and clarity throughout the construction process were critical.

At the outset, the team evaluated two possible project delivery methods:

Choosing between these two delivery approaches without the guidance of a knowledgeable contractor can be overwhelming, as confirmed by Dr. Propp.

> *“It is very daunting to jump into something brand new, so it was helpful to have someone walk us through the process from start to finish." *

### ![1-web-or-mls-J2G01067](https://www.therushcompanies.com/hs-fs/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/1-web-or-mls-J2G01067.jpg?width=2048&height=1368&name=1-web-or-mls-J2G01067.jpg)The Solution

**Why Design-Build Was the Right Choice**

The Design-Build approach allowed Rush Commercial to overlap design and construction phases, significantly accelerating the project timeline while improving communication and cost control. In a traditional Design-Bid-Build model, the process is sequential:

Each step must be completed before the next begins, creating delays and limiting flexibility. In contrast, Design-Build streamlines the process by integrating the contractor and designer from the beginning: 

Because these phases overlap, projects move forward faster and with fewer disruptions.  Brett Griffin, Project Executive at Rush Commercial, can attest to this. 

> *"With Design-Build, we're aligning design, budget, and construction from day one. That eliminates downtime between phases and keeps the project moving forward without unnecessary delays."*

### ![21-web-or-mls-J2G01123](https://www.therushcompanies.com/hs-fs/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/21-web-or-mls-J2G01123.jpg?width=2048&height=1368&name=21-web-or-mls-J2G01123.jpg)The Results

**A Faster, More Flexible Process**

By choosing Design-Build, the project team was able to respond quickly to changes and maintain momentum throughout the project lifecycle. Dr. Propp saw this benefit firsthand.

> *“The most useful part of the design-build approach was the ease of making changes as necessary and having our team be able to access the space more easily. I believe that if we didn't use the design-build approach, our construction time would have been delayed significantly. The Rush team was very quick to respond to changes and once we finalized our layout, our permitting process seemed to take no time at all.” *

According to Brett, “Because we’re involved early, we can pivot quickly when changes come up, without stopping the project or revisiting completed design work.” 

**Delivering Speed When It Matters Most**

For Dr. Propp, speed wasn’t just a preference; it was critical to launching his practice.

“I knew I wanted to start my practice as soon as possible, so timing was important for me.”

Design-Build enabled an accelerated timeline by removing gaps between phases and keeping decision-making centralized within one team, which is why Brett is a huge proponent of this delivery method.

> *“For tenant improvements, especially in healthcare, every week saved translates directly to business value. Design-Build helps clients open their doors sooner." *

![30-web-or-mls-J2G01150](https://www.therushcompanies.com/hs-fs/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/30-web-or-mls-J2G01150.jpg?width=2048&height=1368&name=30-web-or-mls-J2G01150.jpg)

A Seamless, Collaborative Experience

The Design-Build model created a more cohesive experience by aligning all stakeholders under a single team. Dr. Propp emphasized the value of this integration.

> *“I see the value in having the team designing the space also be the ones completing the work. It makes for a more seamless process.” *

This alignment reduced decision fatigue, improved communication, and ensured that the project stayed true to the client’s vision.

**The Final Result**

The completed Propper Smiles Orthodontics clinic reflects both functional improvements and a calming patient experience. Key components include:

- - A welcoming, custom-designed reception area
    - Expansive staff lounge for team comfort 
    - Added infrastructure supporting three orthodontic chairs
    - Modern finishes with new flooring and paint

The project was delivered efficiently, allowing Dr. Propp to begin operations quickly and with confidence.![20-web-or-mls-J2G01117](https://www.therushcompanies.com/hs-fs/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/20-web-or-mls-J2G01117.jpg?width=1022&height=683&name=20-web-or-mls-J2G01117.jpg)

**Design-Build vs. Design-Bid-Build: A Clear Advantage**

This project highlights the measurable benefits of Design-Build:

> *“Design-Build isn’t just faster, it’s smarter. It aligns the entire team around the client’s goals and delivers a better overall experience,” says Brett.  *

### Conclusion

For Propper Smiles Orthodontics, the Design-Build approach proved to be a clear win. Rush Commercial delivered a high-quality tenant improvement on an accelerated timeline, while Dr. Propp benefited from a smoother, more collaborative process.

As more clients prioritize speed, efficiency, and certainty, Design-Build continues to stand out as the preferred delivery method for tenant improvements and beyond.![26-web-or-mls-J2G01138](https://www.therushcompanies.com/hs-fs/hubfs/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/26-web-or-mls-J2G01138.jpg?width=2048&height=1368&name=26-web-or-mls-J2G01138.jpg)

Learn more about the Propper Smiles Orthodontics remodel [here](https://www.therushcompanies.com/portfolio/propper-smiles-ortho). 

Ready to partner to build your dream clinic?

[![Let's Chat!](https://no-cache.hubspot.com/cta/default/4170409/a5c22845-dab7-4584-b3eb-dd900d08ee96.png)](https://cta-redirect.hubspot.com/cta/redirect/4170409/a5c22845-dab7-4584-b3eb-dd900d08ee96)

### Share Article

- [**](http://www.facebook.com/sharer/sharer.php?u=https://www.therushcompanies.com/blog/case-study-design-build-vs.-design-bid-build-for-dental-clinic-remodels)
- [**](https://twitter.com/intent/tweet?url=https://www.therushcompanies.com/blog/case-study-design-build-vs.-design-bid-build-for-dental-clinic-remodels&text=Case%20Study:%20Design-Build%20vs.%20Design-Bid-Build%20for%20a%20New%20Dental%20Clinic)
- [**](http://www.linkedin.com/shareArticle?mini=true&url=https://www.therushcompanies.com/blog/case-study-design-build-vs.-design-bid-build-for-dental-clinic-remodels)
- [** ](mailto:?body=https://www.therushcompanies.com/blog/case-study-design-build-vs.-design-bid-build-for-dental-clinic-remodels)

## Related Articles

<https://www.therushcompanies.com/blog/mary-bridge-childrens-therapy-center-opens>

[Rush Commercial](https://www.therushcompanies.com/blog/tag/rush-commercial), [Case Studies](https://www.therushcompanies.com/blog/tag/case-studies)

### [Mary Bridge Children’s Therapy Center Opens in Tacoma: Expanding Access to Pediatric Rehabilitation Services](https://www.therushcompanies.com/blog/mary-bridge-childrens-therapy-center-opens)

 The Rush Companies in partnership with MultiCare is pleased to announce the opening of MultiCare Mary Bridge Children's Therapy Services. The new...

[Read More](https://www.therushcompanies.com/blog/mary-bridge-childrens-therapy-center-opens)

<https://www.therushcompanies.com/blog/fryar-flats-now-open-and-leasing-in-sumner>

[Rush Commercial](https://www.therushcompanies.com/blog/tag/rush-commercial), [Case Studies](https://www.therushcompanies.com/blog/tag/case-studies)

### [Fryar Flats Now Open and Leasing in Sumner](https://www.therushcompanies.com/blog/fryar-flats-now-open-and-leasing-in-sumner)

 Rush Commercial Construction, Inc., in partnership with owner and operator Dobler Management Company, Inc. (DMCI), is pleased to announce the opening...

[Read More](https://www.therushcompanies.com/blog/fryar-flats-now-open-and-leasing-in-sumner)

<https://www.therushcompanies.com/blog/village-concepts-of-lake-stevens-now-open>

[Rush Commercial](https://www.therushcompanies.com/blog/tag/rush-commercial), [Case Studies](https://www.therushcompanies.com/blog/tag/case-studies)

### [Village Concepts of Lake Stevens Now Open: A New Senior Living Community in Snohomish County](https://www.therushcompanies.com/blog/village-concepts-of-lake-stevens-now-open)

 Village Concepts of Lake Stevens is now welcoming residents, bringing a modern, full-service senior living experience to Snohomish County.

[Read More](https://www.therushcompanies.com/blog/village-concepts-of-lake-stevens-now-open)

Copyright © 2026 The Rush Companies. All rights reserved.

- [Privacy Policy](https://www.therushcompanies.com/privacy-policy)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "articleBody" : "Industry: Healthcare Challenge: Choosing the ideal project delivery method for this clinic remodel: Design-Bid-Build (DBB) versus Design-Build (DB). Results: The Design-Build approach enabled an accelerated timeline by removing gaps between phases and keeping decision-making centralized within one team. Project Details Rush Commercial completed this 1,635 SF tenant improvement for Propper Smiles Orthodontics in Gig Harbor, WA. The project gave Dr. Nicholas Propp a new clinic where he could serve patients and staff with a custom reception desk, expansive staff lounge, added infrastructure to accommodate three orthodontic chairs, and new flooring and paint throughout. The Challenge Like many healthcare providers, Dr. Propp’s goal was to open his new clinic quickly without compromising on quality. Speed, coordination, and clarity throughout the construction process were critical. At the outset, the team evaluated two possible project delivery methods: Design-Bid-Build (DBB): A traditional, linear approach where design is completed before bidding and construction begins. Design-Build (DB): An integrated approach where the construction team works directly with the design team from the start. Choosing between these two delivery approaches without the guidance of a knowledgeable contractor can be overwhelming, as confirmed by Dr. Propp. “It is very daunting to jump into something brand new, so it was helpful to have someone walk us through the process from start to finish.\" The Solution Why Design-Build Was the Right Choice The Design-Build approach allowed Rush Commercial to overlap design and construction phases, significantly accelerating the project timeline while improving communication and cost control. In a traditional Design-Bid-Build model, the process is sequential: Test Fit Engage designer Finalize design Submit for permit RFP Select contractor Begin construction Each step must be completed before the next begins, creating delays and limiting flexibility. In contrast, Design-Build streamlines the process by integrating the contractor and designer from the beginning: Test Fit Develop preliminary budget early Engage contractor, who will then engage the designer simultaneously Finalize design alongside real-time cost input Submit for permit while aligning construction planning Begin construction sooner Because these phases overlap, projects move forward faster and with fewer disruptions. Brett Griffin, Project Executive at Rush Commercial, can attest to this. \"With Design-Build, we're aligning design, budget, and construction from day one. That eliminates downtime between phases and keeps the project moving forward without unnecessary delays.\" The Results A Faster, More Flexible Process By choosing Design-Build, the project team was able to respond quickly to changes and maintain momentum throughout the project lifecycle. Dr. Propp saw this benefit firsthand. “The most useful part of the design-build approach was the ease of making changes as necessary and having our team be able to access the space more easily. I believe that if we didn't use the design-build approach, our construction time would have been delayed significantly. The Rush team was very quick to respond to changes and once we finalized our layout, our permitting process seemed to take no time at all.” According to Brett, “Because we’re involved early, we can pivot quickly when changes come up, without stopping the project or revisiting completed design work.” Delivering Speed When It Matters Most For Dr. Propp, speed wasn’t just a preference; it was critical to launching his practice. “I knew I wanted to start my practice as soon as possible, so timing was important for me.” Design-Build enabled an accelerated timeline by removing gaps between phases and keeping decision-making centralized within one team, which is why Brett is a huge proponent of this delivery method. “For tenant improvements, especially in healthcare, every week saved translates directly to business value. Design-Build helps clients open their doors sooner.\" A Seamless, Collaborative Experience The Design-Build model created a more cohesive experience by aligning all stakeholders under a single team. Dr. Propp emphasized the value of this integration. “I see the value in having the team designing the space also be the ones completing the work. It makes for a more seamless process.” This alignment reduced decision fatigue, improved communication, and ensured that the project stayed true to the client’s vision. The Final Result The completed Propper Smiles Orthodontics clinic reflects both functional improvements and a calming patient experience. Key components include: A welcoming, custom-designed reception area Expansive staff lounge for team comfort Added infrastructure supporting three orthodontic chairs Modern finishes with new flooring and paint The project was delivered efficiently, allowing Dr. Propp to begin operations quickly and with confidence. Design-Build vs. ...",
  "articleSection" : null,
  "author" : {
    "@type" : "Person",
    "name" : "The Rush Companies",
    "url" : null
  },
  "dateModified" : "2026-04-07T21:03:37Z",
  "datePublished" : "2026-04-07T16:03:25Z",
  "description" : "Discover how the Design-Build approach transformed the remodel of Propper Smiles Orthodontics, delivering speed, flexibility, and improved collaboration.",
  "headline" : "<span id=\"hs_cos_wrapper_name\" class=\"hs_cos_wrapper hs_cos_wrapper_meta_field hs_cos_wrapper_type_text\" style=\"\" data-hs-cos-general-type=\"meta_field\" data-hs-cos-type=\"text\" >Case Study: Design-Build vs. Design-Bid-Build for a New Dental Clinic</span>",
  "image" : {
    "@type" : "ImageObject",
    "height" : 630,
    "url" : "https://4170409.fs1.hubspotusercontent-na1.net/hubfs/4170409/Rush%20Commercial/Propper%20Smiles_%20Dr.%20Propp/16-web-or-mls-J2G01105.jpg",
    "width" : 1200
  },
  "mainEntityOfPage" : {
    "@id" : "https://www.therushcompanies.com/blog/case-study-design-build-vs.-design-bid-build-for-dental-clinic-remodels",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://4170409.fs1.hubspotusercontent-na1.net/hubfs/4170409/Rush%20Logo-2.svg"
    },
    "name" : "The Rush Companies"
  }
}
```